Outside view of Edged Data Center, with two cars on the highway, a green fence, and a blue/grey building.
data centers icon.

Edged Data Center

Aurora, Illinois

Data Center solutions that meet the technical and operational requirements of each project.

Edged Data Center

The FCL Advantage in Data Centers: Our comprehensive business-centric design-build plans balance the demands for security, reliability and control — while providing solutions for expansion and next-generation technology in mission critical projects. 

This project consists of a 207,967 square foot, two-story data center shell building, designed with a 40-foot clear height. It includes 11,309 square feet of Class A office space and offers 36 MW of critical load capacity, supported by an N+1 Tier 3 facility design for high reliability. The infrastructure is also prepared for the future installation of a 130 MW substation.

The design features the installation of owner-supplied, proprietary waterless chillers and the addition of diesel generators, increasing the total from three to four units. The building incorporates an ultra-efficient, carbon-neutral design, utilizing advanced waterless cooling systems and power conservation strategies to ensure sustainability and energy efficiency.

region FCL | Midwest
type Mission Critical
size 200,000 sq. ft.
YOUR REPRESENTATIVE

Chris Moore

Vice President of Project Development

1/3

 2025/08/Edged-ORD01-1.jpg
 2024/02/Edged-ORD01-1_power.jpg
 2024/02/Edged-ORD01-1_piping.jpg
KEY FEATURES

207,967 sq. ft. two-story data center shell building

40-ft. clear height

11,309 SF of Class A Office

36 MW Critical Load Available

N+1 Tier 3 Facility

Infrastructure for future 130 MW Substation

Install of owner supplied/proprietary waterless chillers

Install diesel generators 3 to make 4 line up

Ultra-efficient carbon-neutral design including waterless cooling systems and power conservation

Related Projects

exterior equinix building, 1905 signage, contemporary building, photo taken on a cloudy day. trees planted around building and in front of entrance.

Equinix CH3

Elk Grove Village, Illinois

 2024/02/Exodus-CH2.jpg

Exodus Communications CH2

Oak Brook, Illinois

Aerial view of the North Lake Tech Center, parking lot to the side and a highway at the top of the image.

North Lake Tech Center

Northlake, Illinois