The FCL Advantage in Data Centers: Our comprehensive business-centric design-build plans balance the demands for security, reliability and control — while providing solutions for expansion and next-generation technology in mission critical projects.
This 206,000 sq. ft. ground-up 2-story facility represents more than just an advanced level of infrastructure. It’s purpose-built for unmatched connectivity, reliability, and scalability. Built with Tier III standards, multiple fiber providers, diverse points of entry, and a 100% uptime SLA, this project embodies FCL’s commitment to perform at the highest level.
| region | FCL | Midwest |
| type | Mission Critical |
| size | 206,000 sq. ft. |
Regional Vice President, Midwest
1/8
206,000 sq. ft. two-story data center facility on 14+ acre site
2 loading dock bays
2 “Meet Me” rooms and office/lobby buildout
24 MW Critical Load Capacity
N+2 Tier 3 design concurrently maintainable
Designed for 24x7x365 access with 100% uptime SLA
Installation of owner-supplied/proprietary waterless chillers, resulting in 72% reduced energy overhead through zero water cooling.